BIM

Building Information Modeling

Herbert Hoover High School Theater, San Diego, CA | General Contractor: Balfour Beatty Construction | 325 Tons of Steel

Herbert Hoover High School Theater, San Diego, CA
General Contractor: Balfour Beatty Construction | 325 Tons of Steel


Rossin Steel uses Building Information Modeling (BIM) software to create models that assist in determining the accurate, reliable and detailed information needed for successful construction execution. We welcome the resulting smoother workflow in producing our company’s shop drawings and field erection drawings / working models. We typically use Tekla Structures BIM software, as it works with all materials and the most complex structures. We’ve successfully used Tekla Structures to model office buildings, theaters, casinos, bridges and schools.

Herbert Hoover High School Theater, San Diego, CA | General Contractor: Balfour Beatty Construction | 325 Tons of Steel
Herbert Hoover High School Theater, San Diego, CA | General Contractor: Balfour Beatty Construction | 325 Tons of Steel